PDCA Cycle

Design of Experiments (DOE)

Whenever we have to make an experimental design, two main issues are important to any business, one is to reduce the number of samples and to manage the costs systematically. Also, all the necessary information should be available in proper proportion. It requires an optimal design that ensures adequate sampling by minimizing the number of […]

Design of Experiments (DOE) Read More »

Kano Model – Analysis Tool

What is Kano Model? || Kano Model Process Flow table || Kano Model Analysis [ Basic (Most be required)] / [Performance (More is Better)] / [Delighters] || 5 Steps of Kano Model Process – How to Use Kano Model? ||     What is Kano Model?   Kano Model is systematic approach to prioritize customer requirements based on understanding customer needs and value

Kano Model – Analysis Tool Read More »

Measurement System Analysis (MSA)

What is Measurement system analysis (MSA)?   Measurement system analysis(MSA): A process where statistical studies are being conducted to analyse the variation present in the results of each type of measuring and testing equipment system. Now day, every organization is understanding importance and widely used measurement system to quantify the variation which is only way

Measurement System Analysis (MSA) Read More »

8D (Eight Disciplines) – The problem Solving tool

What is 8D (Eight Disciplines)? || Benefits of 8D (Eight Disciplines) || 8D (Eight Disciplines) Process Chart || 8D (Eight Disciplines) Methodology || 8D – Containment actions checklist || Verify Corrective Actions Process Flow || The 8D report   In this modern era, to sustain products in the market needs to use advanced manufacturing processes. Modern machinery and cost effective processes for produce quality products with low

8D (Eight Disciplines) – The problem Solving tool Read More »

Advanced Product Quality Planning (APQP)

What is APQP? || APQP Classification || Initial Risk Evaluation || Advanced Product Quality Planning (APQP) Phases || APQP 23 Elements   Since last 15 years, in manufacturing industry vast changes we can see due to awareness of system improvement, and focus on micro level management. A broader revolution of chain management impacts overall supplier chain, which makes compulsory to focus on weakness

Advanced Product Quality Planning (APQP) Read More »

Total Productive maintenance (TPM)

What is TPM? || Why Total Productive Maintenance (TPM)? || Total Productive maintenance (TPM) is broad thought || TPM System || Components of TPM (Total Productive maintenance) || 8 Pillars of TPM (Total Productive Maintenance) || How to implement Total Productive Maintenance (TPM) || Define Role & responsibility for TPM implementation || 12 Steps of TPM implementation || OEE (Overall Equipment Effectiveness)     What is TPM?   ” Total productive maintenance (TPM)

Total Productive maintenance (TPM) Read More »

8 Pillars of TPM

What is 8 Pillars of TPM (Total Productive Maintenance)? The concept of 8 pillars of TPM is improvement in equipment reliability by prevention and proactive activities.   TPM 8 Pillars: Autonomous Maintenance Focused Improvement Planned Maintenance Quality Maintenance Early Management / Development Management Training and Education Safety, Health and Environment Office TPM The purposes, expectations

8 Pillars of TPM Read More »

Scroll to Top